TFMoran provided survey, engineering, and construction administration services for the Rail Trail project that improves the trail surface along three miles of former railroad. The municipally-managed project improved safety and accessibility for the rural multi-use pathway with portions in Swanzey and Keene, NH. The abandoned rail line was surveyed and an Existing Conditions Plan was prepared. TFMoran used the plan to evaluate areas that require improvements to upgrade the trail. Construction bid documents and specifications were prepared in accordance with the NHDOT TE project standards, along with cost estimates. Coordination with PSNH power line improvements and preservation of historic stone culverts were important components of this project.