TFMoran provided survey, site/civil design, local, state and federal permitting, and construction phase services for the rebuild of the Unitil Gulf Street Substation and 374 line. The project consisted of the removal, rebuild and expansion of the existing Gulf Street Substation, retiring vintage substation equipment and installing new current technology and replacement of existing utility poles and overhead lines associated with the 374 distribution line located within an adjacent existing utility right-of-way. The substation and line upgrades will accommodate current and future load growth throughout the downtown Concord area.