Archive

0

Construction Begins on Marmon Aerospace Hooksett Facility

Marmon Aerospace & Defense recently held a groundbreaking ceremony for their new 81,600 SF facility located at the former site of Legends Golf in Hooksett. The new facility will house a state-of-the-art manufacturing operation and has an aggressive schedule for delivery of the building in the Fall of 2023.

Attendees enjoyed the amenities the site still has to offer, including a driving range, and a mini golf course that is staying at the site until the facility is further expanded.

NH Governor Chris Sununu attended, as well as representatives from Marmon Holdings, and TFMoran Principal Nick Golon.

TFMoran is providing civil/site engineering, structural engineering, surveying, landscape architecture, stormwater monitoring, construction administration, and permitting services for the project.

The Union Leader covered the event, see the full article here.

0

Breaking Ground at Uni-Cast

TFMoran recently attended the groundbreaking ceremony at Uni-Cast held on Monday June 24th.

In attendance (left to right) were Dan Boisvert- Boisvert Electric President, Paul Berube- Uni-Cast, Andrew Murray- SADCO, Dave Fuller- SADCO, Nick Golon- TFMoran Sr. Project Manager, Henri Fine- President of Uni-Cast, Jeremy Belanger- TFMoran Sr. Project Engineer, Peter Flynn- Flynn Construction Corp., and John Turner- Team Engineering President.

The project is set to involve an expansion of the existing facility located on Industrial Drive in Londonderry, New Hampshire. Uni-Cast is a manufacturer of sophisticated aluminum castings known for their strict quality control and capability to produce some of the industry’s more challenging applications.

Henri Fine, President of Uni-Cast

The proposed expansion includes an over 9,600 sf manufacturing, and 900 sf office addition to the north side of the building, as well as another 2,700+ sf manufacturing addition on the south side of the building. Additional improvements include parking lot expansion and the rebuilding of their stormwater detention basin to current Town and State standards.

TFMoran provided Site Design, Civil Engineering, Permitting, Survey, and Landscape Architecture services.

Architectural elevation plans courtesy of Team Engineering.

Congratulations to Uni-Cast!

0

October ground breaking event held for Franklin Savings Bank in Goffstown, NH

After being postponed for a few weeks, due to heavy rains, the ceremonial ground breaking event for the new Franklin Savings Bank in Goffstown, NH took place on a sunny Friday, October 5, 2018. More than a dozen key people involved in the project lined up with shiny new shovels, ready to dig in for the official ground breaking photo. Included in the photo were FSB’s president and several from the FSB leadership team, town officials, and representatives from Paramount Partners, Sullivan Construction and TFMoran.

Construction has all ready begun for the new 2,161 square foot branch office located on Mast Road in the Pinardville area, and is expected to be complete in February 2019. The bank will be part of Abingdon Square, a mixed-use development designed by TFMoran that currently includes a Rite Aid pharmacy and workforce housing. The bank will feature two drive-up lanes, a smart ATM and technology bar. This will be the eighth full-service location, and the third office in southern New Hampshire.

The FSB project team includes Paramount Partners of Quincy, MA, DeStefano Architects of Portsmouth, Sullivan Construction of Bedford, NH and TFMoran. TFMoran provided land surveying, civil engineering, structural engineering, traffic engineering, permitting and landscape architecture services for the project. This is the second bank project for this team, the first was the FSB in Merrimack, NH completed in 2017.

0

“Large waterfront project breaks ground in Nashua”

TFMoran’s president Robert Duval attended the ground breaking ceremony of one of TFMoran’s multi-residential civil engineering projects in Nashua on Thursday, December 1, 2016. Also in attendance were project developer SMC Management Corporation of Watertown, MA; project architect DeStefano Architects of Portsmouth, NH; and general contractor Fulcrum Associates of Amherst, NH.

The New Hampshire Union Leader was on hand to cover the event and published the story the following day. “Large waterfront project breaks ground in Nashua” was the headline written by Union Leader Correspondent Kimberly Houghton. Click here for the link,  or read text below:

NASHUA — A massive waterfront project that could potentially bring 750 apartments to the Gate City broke ground on Thursday, about 10 years after the concept was first discussed.

Officials broke ground on the first phase of Renaissance Downtowns’ Residences at Riverside Landing, which will provide an initial 152 luxury apartments close to the downtown area.

The entire project includes several phases of construction and a total of 750 residential units with various neighborhood amenities along the river.

“We need to provide good housing options,” Mayor Jim Donchess said during Thursday’s groundbreaking ceremony at 50 Bridge St. Local employers are desperate for new workers, and housing must be available in order for those potential employees to choose Nashua as their home, he said.

The Residences at Riverside Landing will initially include 152 studio, one and two bedroom units in two multifamily buildings, along with a 50-seat restaurant, retail and residential amenities.

“Right now, our region has a very low vacancy rate,” said James Vayo, a downtown specialist for the city and one of the individuals who helped spearhead the development project.

With few housing options available, he said, it drives up rental costs and creates less affordable housing in the city. The number of apartment units eventually built on Bridge Street will ultimately be determined by market demand, according to Vayo.

Jack Tulley, chairman of the Nashua Business Industrial Development Authority, said the new waterfront development will utilize a large piece of land that is currently unproductive, and instead put it to good use.

“BIDA is very excited to help shepherd such a wonderful project through the process, and to the benefit of the city,” he said.

The city has owned the Bridge Street property since the 1940s. Previously, city officials entered into negotiations with Renaissance Downtowns of New York to sell the property for redevelopment.

Once all of the construction phases are complete, the Bridge Street project will include not only housing, but also a community center, courtyards, a park and a community pool.

“This is a key gateway into Nashua,” said former Mayor Donnalee Lozeau, who was instrumental in helping to move the project forward. “We have such an opportunity here.”

Lozeau said the complex, once finished, will be within walking distance of a future train station being considered for Crown Street.

“The highest and best use for this site is residential property,” she said, praising all of the people who helped advance the project to this point.

Donchess agreed, saying the city is working hard to bring in new economic investment, and that housing projects are the catalyst to improving the vitality of Nashua’s downtown.

According to the mayor, the development will bring more than $250,000 in new property taxes to the city, and will have an overall economic impact of about $40 million.

It could take about 18 months to two years for the apartments to be completed and occupied.

[email protected]