Catholic Medical Center Expansion Project Featured in Business NH Magazine article: “Building Stronger Health Care”

TFMoran provided surveying, civil engineering, landscape architecture and permitting services for the the Catholic Medical Center expansion project, recently featured in Business NH Magazine.

CMC broke ground in 2019 on this multi-year project adding a new building at its McGregor Street campus to create a home for the New England Heart & Vascular Institute, up to 90 private patient rooms, additional operating suites, and a larger, upgraded Emergency Department.


The plan also involved acquiring a nearby retail parcel that once belonged to the hospital, relocating the Rite Aid on that site to a new building closer to the street, and removing the remaining vacant strip mall.

“This project is going to transform not just this campus and CMC, but that entire parcel of land to then serve as a gateway to the West Side of Manchester,” says Alex Walker, president, and CEO of CMC. “In a sense, it’s an economic development project as well.”

CMC is bringing its New England Heart & Vascular Institute under one roof, says Walker, “We have 50-plus providers in the Institute. It’s a big group that provides world-class heart and vascular care, but it’s a hodgepodge of spaces and locations throughout the organization. For example, our cath labs are on level A, the main clinical spaces are on level B, and our EP labs are up on level C. To get that all under one space as a true heart vascular institute is an important strategic imperative for us,” he says.

Check out the full article here.

0

Atlantic Orthopaedics New Surgery Center Featured in High Profile

A recent project of TFMoran’s Seacoast Division, Atlantic Orthopaedics & Sports Medicine’s new ambulatory surgery center “New England Center for Orthopaedic Surgery”  is featured in High Profile Monthly‘s June issue focused on Healthcare Facilities! The project, which is in its second phase, is expected to be complete this summer.

The first phase of the project was completed in 2016. Phase two began with an amended site plan, approved by the city in 2019. The project team for both phases included Hereford Dooley Architects, and BBL Construction Services, working closely with the City of Portsmouth and affiliate Portsmouth Regional Hospital. TFMoran provided civil/ site design, permitting, land surveying, landscape architecture, and construction administrative services for the project located on 1900 Lafayette Road in Portsmouth, NH.

The issue also covers other recent TFM news including Aiden Behar joining the TFMoran Structural Team, and the Sig Sauer Experience Center groundbreaking event!

See the full issue here.

0

Another TFM Structural Project Featured in High Profile’s Fast Facts Friday!

TGIF- and happy Fast Facts Friday! Acton Medical Associates at Highland Commons, a recent TFMoran Structural project is featured in High Profile’s Fast Facts Friday! Located in Hudson, MA, TFMoran Structural Engineers worked closely with Maugel Architects and Greenleaf Construction. Construction on the project began in September 2020 and was completed in December. Awesome job to everyone involved and thank you to High Profile for the shoutout! Check out the full article here.

0

TFM Structural project, Circle Health, featured in June issue of High-Profile

One of TFMoran’s structural engineering projects, Circle Health, was featured on the cover of the June issue of High-Profile. The story “Circle Health Dracut Nears Completion” appeared on page 25 in the Healthcare Facilities section. TFMoran provided structural design services to Maugel Architects of Harvard, MA for a new 30,000sf three-story medical office building located at the corner of Broadway and Loon Hill Road in Dracut, MA. The new facility will provide a Circle Health Urgent Care and Lowell General Hospital patient service center, and also include physician practices and diabetes specialty services.

To see the full June issue of High-Profile, click here.

To view the Circle Health story click on this pdf link high profile June 2018_Circle Health story  or read the text below:

Circle Health Dracut Nears Completion

Dracut, MA – Maugel Architects announced construction is nearing completion at Circle Health’s new Dracut facility. The 27,000sf, three-story medical office building, located at the corner of Broadway and Loon Hill Road, is scheduled to be completed by late summer.

Circle Health Dracut will provide the community with urgent care, patient services, physician offices, and diabetes and endocrinology specialty services. The first floor includes a 10-room Circle Health Urgent Care and a Lowell General Hospital Patient Service Center with services for x-ray, ultrasound, and lab/ blood draw. OB/GYN Associates of the Merrimack Valley and primary care physicians Riverside Medical Group will be located on the second level.

The top floor will contain a Diabetes Management Center and the Lowell Diabetes & Endocrine Center. The two centers will have a centralized reception and waiting area and a large educational room that will be used to host programs to educate the community.

“Construction on Circle Health Dracut is coming along beautifully. We are very excited for the Dracut community and the scheduled opening in late summer,” said Colby Cavanagh, architect for Circle Health at Maugel Architects. “It is always a pleasure to work with the Circle Health team. We are looking forward to our next project together in Circle Health Tewksbury, a new 14,000sf, single-story medical building that will be constructed at the corner of Main Street and Victor Drive.

In addition to urgent care, the facility will house primary care physician offices and a patient services center. Construction is scheduled to be completed in early 2019.

In addition to Circle Health, other team members include Equity Alliance, Dellbrook|JKS Construction, TFMoran, Design Day Mechanicals, and Pristine Engineers.

Maugel previously designed Circle Health outpatient centers in Westford and Billerica.

Design/Build Team

OWNER:
Circle Health

ARCHITECT:
Maugel Architects

GENERAL CONTRACTOR:
Dellbrook|JKS Construction

STRUCTURAL ENGINEER:
TFMoran

MECHANICAL ENGINEER:
Design Day Mechanicals

ELECTRICAL ENGINEER:
(for Circle Health Dracut)
Griffith & Vary

ELECTRICAL ENGINEER:
(for Circle Health Tewksbury)
Pristine Engineers

0

TFM’s MOB Project Featured in High Profile’s June Issue

One of TFMoran’s medical office building projects that is currently under construction was featured in High Profile’s June issue, which focused on Healthcare Facilities.

To view a pdf of the article on page 19 click the following link High-Profile June 2017 or read the text below.

TFMoran Completes Work at Elliot Health System’s Medical Center

Bedford, NH  – TFMoran, Inc., of Bedford, provided site design and civil engineering, permitting, surveying, and landscape architecture services for a new 58,000sf Elliot Health System’s Medical Center located at Hillside Shops at Bedford on Leavy Drive.

The medical office building broke ground in December 2016 and is the final phase of this multi-use development designed by TFMoran and originally developed by AV Bedford, LLC.

This new state-of-the-art medical center will house three existing Elliot primary care practices, that are now at three different locations in Bedford. According to Elliot Health Systems, “The two family medical offices will be combined in the new facility, and the pediatric office will also be relocated in the new center. Services such as lab, mammography, x-ray, bone density screening, and pharmacy will also be included for better patient care.”

This two-story medical office building is located on a sloping site and will have at-grade entries on two sides at upper and lower levels. Lavallee Brensinger Architects of Manchester designed the exterior to have traditional New England forms and materials accenting the entrances and corners.

Constructed by A W Rose Construction, LLC of Manchester, this new facility will be completed in two phases, the first of which includes two levels and is expected to be completed by January 2018. The second phase consists of construction of a third level.